I wasn't able to go by the house Tuesday - Thursday this week so there were a lot of new things to see on Friday afternoon (9/5)! We were having some afternoon summer showers so it was nice and steamy!

Side view of the house. The little yellow poles at the bottom were from the natural gas lines being buried! Still waiting on the power company to come out though. 

Clockwise from the top left:
Front of house, we have stairs, we have bathtubs (this is the hall bathroom), we have doors (to the garage here)

Clockwise from the top left:
Side view of house, view of morning room from the master bedroom window, beautiful fireplace build, view out of morning room into the (muddy) yard

Clockwise from the top left:
Garage plumbing (not sure how it's broken out but one should be for the tankless water heater and one for the sink), front door and windows, shingles on the porch roof, ductwork in the rafters

We followed the trend of putting some scriptures/blessings on the framing. Clockwise from the top left: Entryway, in the master bedroom, kitchen and in Delaney's room. 

View of left corner of the backyard from the master bedroom. 

View of the morning room and other corner of the yard. Plus a view of the road coming into our section of the neighborhood. We will eventually have a house that goes up behind the trees to the right. 


I know I say this with every update, but it's so exciting to see the changes every week (or even day)!!! It's hard to believe this is what it looked like a month ago!


Hope y'all have a great weekend!

6 comments:

  1. Looks like the garage plumbing will be just like ours. That's the sink to the left, the water heater in the middle, and the water shut-offs to the right.

    ReplyDelete
  2. LuLu, that looks great, you guys are cruising right along now.

    ReplyDelete
  3. Yaaayyy for such great progress!

    ReplyDelete